PQVault is a product of QuantiCor Security Visit QuantiCor Security LinkedIn
Use case2 min read

Inspection certificates 3.1 and 3.2: request, check and file certificates from steel suppliers tamper-proof

Mill certificates under EN 10204 often arrive as scanned PDFs by email. How to request signed certificates, match them to the order and pass them on.

Redaktion QuantiCor SecurityQuantiCor Security GmbH · Darmstadt
PQVAULT · BLOG
Key takeaways
  • An inspection certificate is only worth as much as the certainty that it is genuine and unchanged. Scanned PDFs by email do not provide that.
  • In the case, the manufacturer confirms its certificate with a signature, for 3.2 the inspection representative as well. Quality assurance matches the values with the order.
  • The checked certificate can be passed on to your own customer with evidence.

For a pressure vessel, a plant manufacturer orders plates with a 3.2 inspection certificate. The certificate arrives as a scanned PDF by email, signed and stamped, but not verifiable. Whether the values match the heat and whether the document was changed on the way is hard to tell. Requesting an EN 10204 inspection certificate securely means the manufacturer confirms with a signature, the values are available in structured form, and every step is traceable.

Why mill certificates are a risk

The EN 10204 standard distinguishes, among others, type 3.1 certificates, confirmed by the manufacturer's inspection representative, and 3.2, additionally confirmed by an independent inspection representative or the purchaser's. In practice these certificates circulate as PDFs, often forwarded through several tiers of the supply chain. Forged or later altered certificates are a known problem in the industry, and for safety-relevant parts the party that installed them is liable in the end.

The process in Partner Flow

With the template "Inspection certificate EN 10204" in Partner Flow:

  1. Request: quality assurance creates the case for the order. The supplier gets a personal link and confirms their address.
  2. Submit: the supplier enters delivery, heat and test values and attaches the certificate. Everything is encrypted in the browser.
  3. Confirm: the manufacturer confirms the certificate with its signature, for 3.2 the inspection representative as well, both bound to the version.
  4. Match: quality assurance checks the values against the order specification.
  5. Pass on: if needed, the checked certificate goes to your own customer, again with evidence.

Rule of thumb: A certificate only becomes evidence when it is clear who confirmed which version and when.

Several people at the supplier

At the supplier the laboratory often enters the test values while sales looks after the case. The contact can bring in a colleague from their company for the "Values" section. Confirming and submitting stays with the responsible inspection representative. If you also collect CO₂ values for CBAM from suppliers, see Collecting CBAM data from suppliers.

What you can do now

  1. Decide for which materials and parts you require certificates through a fixed process instead of by email.
  2. Request test values in structured form, not just as PDF.
  3. Keep certificates together with confirmation and version.
  4. Pass certificates on to customers with evidence, for example with a link from Store & Share.

Partner Flow encrypts every step with NIST-standardised post-quantum methods. More examples are under Metals.

PQVault is a product of QuantiCor Security GmbH, Darmstadt — specialists in post-quantum cryptography. More about QuantiCor Security

Three solutions for this topic

PQVault

Ready for data that stays confidential tomorrow?

Ready to go as SaaS, hosted in the EU. NIST-standardised post-quantum methods in every module.