NDA gate
The partner sees nothing before the NDA is signed. One NDA covers all further work with that partner.
- NDA register
- Templates per industry
- Validity in view
PQVault Partner Flow
Formula handover to a contract manufacturer, supplier change notifications, quality agreements with a CDMO, CBAM supplier data and CRA reports with suppliers: one shared, end-to-end encrypted place with workflow, deadlines and evidence.
Point at an industry for the summary — a click takes you to the full card below.
CDA in 48 hours instead of weeks, quality agreement with review deadline, technology transfer in stages.
The problem today
CDAs drag on for weeks because templates differ and signatures have to be collected. Quality agreements need an annual review; in technology transfer, files circle by download and upload.
Sources: Drug Discovery Online, Clinical Leader, IntuitionLabs, IPMHow it works in PQVault
Suppliers notify changes in advance — QA decides with a signature, nothing gets lost in an inbox.
The problem today
ISO 13485 requires suppliers to notify changes in advance; 60 to 180 days of lead time are usual. Unannounced changes are a recurring cause of FDA 483 observations; exchanging them by e-mail is considered a risk.
Sources: MedDeviceGuideHow it works in PQVault
The formula only as visible as needed — and no key any more when the contract ends.
The problem today
Synthesis routes are split into modules and awarded to several toll manufacturers. Formulas are transferred by hand — this can take months, and every copy sent by mail stays with the recipient.
Sources: CHEManager, Control EngineeringHow it works in PQVault
CBAM data from hundreds of suppliers without Excel, tamper-evident certificates, one alloy for all plants.
The problem today
CBAM emission data is requested from many suppliers one by one by mail and Excel. Inspection certificates arrive as PDF — forgeries happen. Recipes sit in separate spreadsheets per plant.
Sources: Mayer Brown, Promisteel, Dassault SystèmesHow it works in PQVault
CRA reporting with suppliers within 24 hours — provable with a timestamp per stage.
The problem today
From 11 Sept 2026 the reporting duties of the Cyber Resilience Act apply: early warning within 24 hours, notification within 72 hours, final report within 14 days. From 2027 the Machinery Regulation requires ten years of documentation.
Sources: Jones Day, Author-it, HeukingHow it works in PQVault
PCN and PPAP with tier 2 and 3 suppliers — complementing the manufacturers’ portals.
The problem today
The PCN process often takes many months. Tens of thousands of product changes go unreported every year. Smaller suppliers are not connected to the manufacturers’ portals.
Sources: ZVEI, Z2DataHow it works in PQVault
The mix design to the batching plant only as far as needed — declarations of performance with suppliers on record.
The problem today
Concrete and mortar mix designs go to batching plants and contract fillers as spreadsheets by e-mail. Who holds which version is hard to prove. Suppliers’ declarations of performance are scattered across inboxes.
How it works in PQVault
The partner sees nothing before the NDA is signed. One NDA covers all further work with that partner.
Profile, specification, formula: each stage is released only when the previous one is complete.
“Checked”, “approved”, “implemented from batch” — every statement is signed and verifiable later.
Mandatory deadlines such as 24 hours under the CRA or review periods in quality agreements run as clocks with reminders and deputies.
One request to hundreds of suppliers at once, for example CBAM data or certificates — answers structured and signed.
When the collaboration ends, you withdraw access. New openings are then no longer possible.
| PQVault Partner Flow | E-mail + Excel | Supplier portal | |
|---|---|---|---|
| NDA enforced before access | Yes | No | Rarely |
| Partner needs an account | No | No | Yes |
| Every step signed | Yes | No | Partly |
| Templates per industry | Yes | No | Partly |
What Partner Flow can do — and where the limits are.
Signatures
Signatures are electronic signatures of the platform (simple electronic signature under eIDAS). Where a specific form is required, store the externally signed document as evidence.
Copies
What a partner has viewed, they can copy. Revocation affects future access, watermarks deter.
Validation
For GMP-relevant approvals, the customer validates the system — we provide the validation package.
Answers about secure handover to suppliers and contract manufacturers. Your question is not here? We will show you PQVault in a short demo.
In stages: NDA first, then profile and specification, finally the formula. Each stage is released with a signature, and you revoke access when the contract ends.
A supplier portal requires an account at the partner. Partner Flow works by link without account or licence and is end-to-end encrypted.
No. Partners answer by link, also on mobile and without installing anything.
Partner Flow provides audit trail, signatures and a validation package. The customer validates the system for GMP-relevant approvals.
Create a free account, then choose a plan whenever you are ready. No card to start, nothing to install — encryption happens on your device, our servers only see ciphertext.