Technology transfer to a CDMO: compare three candidates, award one and document the transfer for GMP
In pharma contract manufacturing several CDMOs often compete. How to assess candidates in parallel, fully brief only one and document every step for GMP.
- During selection all candidates see the same profile, but none sees the process. Only the CDMO that wins the contract gets more.
- The EU GMP Guide requires contract giver and acceptor to agree the transfer of knowledge in writing. Signed confirmations per version provide that evidence.
- At the CDMO quality assurance and production fill in together; at the contract giver QA assigns sections to MS&T and the qualified person.
A biotech company is looking for a contract manufacturer (CDMO) for the clinical phase. Three candidates are to submit a quotation; one will later receive the complete process. How to hand over a formulation in stages in general is covered in Handing a formulation to a contract manufacturer. This article is about what pharma contract manufacturing adds: several candidates at once, a selection decision and the GMP evidence.
What the GMP rules require
Under Chapter 7 of the EU GMP Guide, the contract giver must provide the contract acceptor with all information needed to carry out the work correctly and agree the collaboration in writing. For inspections, what counts is who received and confirmed which version and when. Email packages with attachments provide that evidence only with effort.
Several candidates, one contract
With the template "Technology transfer (process / formulation to CDMO)" in Partner Flow, each candidate gets their own case:
- The same profile for all: product type, scale, equipment requirements. Each candidate signs the confidentiality agreement first; a valid NDA from the register is reused.
- Feasibility and quotation: each CDMO answers in its own case. Candidates do not see each other.
- Selection: external manufacturing management compares the quotations and awards the contract. The other candidates' cases are closed and their access ends.
- Transfer to the chosen CDMO: process, composition and test methods go out only after internal signature and release by quality assurance.
- Confirmation: the CDMO confirms review and implementation with a signature bound to the version. QA closes the transfer.
Rule of thumb: A candidate who is not awarded never saw more than the profile.
Who fills in what at the CDMO and internally
At the CDMO, quality assurance and production work together. The invited contact can bring in a colleague from their company for a section, such as production for feasibility. Confirming and signing stays with the contact. Internally, quality assurance assigns sections to MS&T or the qualified person, with a due date and reminder.
What you can do now
- Define a profile that is sufficient for the quotation phase.
- Run one case per candidate so quotations stay separate.
- Close the access of candidates not selected right after the decision.
- For exchanging study data with CROs, see Sharing study data securely.
Partner Flow encrypts every stage with NIST-standardised post-quantum methods; for project exchange after the transfer, a data room in Spaces works well. More examples are under Pharma & medical technology.
PQVault is a product of QuantiCor Security GmbH, Darmstadt — specialists in post-quantum cryptography. More about QuantiCor Security
